Partial re-glazing and full re-decoration.
Our client reported moisture inside their roof units and problems with roof lantern leaks. On inspection the roof seals were failing, resulting in a full re-seal replacing all seals at the same time as replacing the failed double glazed units. On completion the orangery underwent full redecoration both outside and inside.